
47
RF Measure
: I need to configure an Autosequence step to take an RF current
measurement with a 200 ohm load. My measurement tolerance is 315mA, ±25mA.
Solution
–
1. From the Autosequence menu, select Create New Sequence. Then press Add
Step.
2. Select the desired location for the new step and press OK.
3. The new step will always default to an instruction type step. Select the RF Energy
/ Leakage option button near the bottom of the screen.
4. Press the title Text box to change the step title as desired. You will need to use
an external keyboard for this.
5. Press the Instructions to Operator text box to enter any instructions that the user
might need to perform at this step of the autosequence.
6. Press the Meter Setup button to configure the measurement mode and tolerance.
AUTOSEQUENCES
Содержание ESU-2400
Страница 1: ...ELECTROSURGICAL UNIT ANALYZER ESU 2400 Series USER MANUAL...
Страница 2: ......
Страница 9: ...vii...
Страница 44: ...32 5 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Страница 46: ...34 5 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Страница 48: ...36 6 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Страница 50: ...38 6 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Страница 177: ...165 This Page Intentionally Left Blank...
Страница 186: ...174 NOTES...
Страница 187: ...175 NOTES...
Страница 188: ...176 NOTES...
Страница 189: ......