6.2 Initial commissioning of the drive system
Make sure that external pulse enabling is inhibited before starting initial commissioning in order to
avoid uncontrolled starting of the motor.
It is assumed that the individual controllers are set to default values which guarantee a perhaps not
optimum, but controlled operation of the motor.
Subsequently the following parameters should be set or their values checked:
The description of the operation software is covered in a separate operation manual.
PC
unit
Содержание BUS 6-T Series
Страница 6: ...Abbreviations IV Controller BUS 6 T 5 94017 06 Baumüller Nürnberg GmbH ...
Страница 10: ...Technical data 4 Controller BUS 6 T 5 94017 06 Baumüller Nürnberg GmbH ...
Страница 16: ...Type code Technical data 10 Controller BUS 6 T 5 94017 06 Baumüller Nürnberg GmbH 2 3 Type code ...
Страница 18: ...Assembly 12 Controller BUS 6 T 5 94017 06 Baumüller Nürnberg GmbH ...
Страница 22: ...Installation 16 Controller BUS 6 T 5 94017 06 Baumüller Nürnberg GmbH ...
Страница 26: ...Installation Terminal Diagram 20 Controller BUS 6 T 5 94017 06 Baumüller Nürnberg GmbH 5 4 Terminal diagram I ...
Страница 40: ...Commissioning 34 Controller BUS 6 T 5 94017 06 Baumüller Nürnberg GmbH ...
Страница 45: ...Initial commissioning Commissioning Controller BUS 6 T 39 Baumüller Nürnberg GmbH 5 94017 06 PC unit ...
Страница 46: ...Commissioning Initial commissioning 40 Controller BUS 6 T 5 94017 06 Baumüller Nürnberg GmbH PC unit ...
Страница 47: ...Initial commissioning Commissioning Controller BUS 6 T 41 Baumüller Nürnberg GmbH 5 94017 06 PC unit ...
Страница 49: ...Main spindle area Commissioning Controller BUS 6 T 43 Baumüller Nürnberg GmbH 5 94017 06 PC unit ...
Страница 52: ...Commissioning Torque control 46 Controller BUS 6 T 5 94017 06 Baumüller Nürnberg GmbH PC unit ...
Страница 56: ...Parameters Basic settings 50 Controller BUS 6 T 5 94017 06 Baumüller Nürnberg GmbH 7 2 Basic settings ...
Страница 79: ...Parameter set 0 Parameters Controller BUS 6 T 73 Baumüller Nürnberg GmbH 5 94017 06 7 4 Parameter set 0 ...
Страница 85: ...Parameter set 0 Parameters Controller BUS 6 T 79 Baumüller Nürnberg GmbH 5 94017 06 7 4 3 Speed controller ...
Страница 106: ...Maintenance Status messages 100 Controller BUS 6 T 5 94017 06 Baumüller Nürnberg GmbH 8 2 Status messages ...