4 . T S M S e r v i c e P r o g r a m
1 / 2 0 1 0
4 - 84
BA-TE-DE08C M.KAY
SW9xx_SM_Chapter 4-2-1_1_2010.doc/pdf <110301> yymmdd
B. Braun Avitum AG
Dialog
+
SW 9.xx
4.8.2.10
Test 1.10 Degassing and Heating
1.
Activate the Degassing and Heating menu with
the Degassing and Heating key in the LL
Manual Test menu. The following menu is
displayed.
2.
Check the functions with the appropriate keys.
You can skip directly to the calibration of the pressure sensor
PE
or the
temperature sensor
TSHE/TSE
by pressing the appropriate
or
key.
TSHE
is calibrated together with
TSE
.
The components of the degassing and heating circuit can be tested step by
step.
All balance chamber valves are switched so that one half of the balance
chamber is open and the other side closed to position the membrane.
The flow pump
FPE
and
FPA
have the same speed and work in main flow. If the
speed of
FPE
is set the degassing pump
EP
starts automatically with a higher
speed.
The heater
H
is stopped if the degassing pump
EP
< 500 rpm, the degassing
temperature sensor
TSE
> 89
o
C or the upline tank VB is empty.
The degassing pump
EP
must be able to build up a flow of > 1200 ml/min at a
negative pressure of - 500 mmHg.