
Installation Manual
Page 49
IP Office 2.1
40DHB0002USCL Issue 10c (11th May 2004)
Installing a New System
Unpacking
Before proceeding with installation, ensure that you have read the notes covered in
Expansion Modules
above.
Unpacking and checking :
1. Before unpacking check for any signs of damage that has occurred during transit. If any damage
exists bring it to the attention of the carrier.
2. Check all cartons against the packing slip and ensure that you have the correct item as per the
country variants (see
Overview of Country Variants
). Report any errors or omissions to the
equipment supplier.
3. While unpacking the equipment, retain all the packaging material. Fault returns are accepted only
if repackaged in the original packaging.
4. Visually inspect each item and check that all the necessary documentation and accessory items
have been included. Report any errors or omissions to the dealer who supplied the equipment.
5. Ensure you read and understand any documentation included with any item.
Содержание IP403 Office
Страница 1: ...IP Office 2 1 Installation Manual 40DHB0002USCL Issue 10c 11th May 2004 ...
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 20: ......
Страница 26: ......
Страница 32: ......
Страница 38: ......
Страница 54: ......
Страница 70: ......
Страница 76: ......
Страница 84: ......
Страница 112: ......