PN 9000-246-VE, Rev D
Pre-Installation Requirements
Storage Prior to Installation
If the analyzer is stored for any period of time prior to installation, store it in its
shipping case, in an environment where it is not subject to dripping or splash-
ing liquids, corrosive gases, high humidity, or excessive heat or cold. Recom-
mended storage conditions include:
Temperature:
-20 to +50 °C (-4 to 122 °F)
Relative Humidity:
<90 %
Failure to comply with these storage conditions will void your warranty.
Uncrating and Inspecting the Analyzer
Open the shipping and storage case the 5100P Analyzer is shipped in and
inspect the instrument for damage. If equipment is damaged, notify the carrier
and contact AMETEK Service (https://www.ametekpi.com/customersupport/
requestsupport) immediately if parts are missing or damage is found, and to
verify if damaged parts will require replacement prior to safely connecting and
operating the analyzer.
Tools, Equipment, and Supplies Required to
Connect and Prepare the 5100P for Operation
To prepare the analyzer for operation you need the following tools, equip-
ment, and supplies:
• Set of open-end wrenches for fittings.
• Detergent-based leak detector (Snoop® or another suitable leak detection
agent is permissible).
2-2 | 5100P TDLAS Analyzer
Содержание 5100P
Страница 1: ...5100P TDLAS Analyzer USER MANUAL PN 9000 246 VE Rev D 5000 016 PI REV A...
Страница 10: ...PN 9000 246 VE Rev D This page intentionally left blank x 5100P TDLAS Analyzer...
Страница 28: ...PN 9000 246 VE Rev D This page intentionally left blank 2 14 5100P TDLAS Analyzer...
Страница 64: ...PN 9000 246 VE Rev D This page intentionally left blank 3 36 5100P TDLAS Analyzer...
Страница 82: ...PN 9000 246 VE Rev D This page intentionally left blank 5 4 5100P TDLAS Analyzer...