OPERATION
104
Condor-UM-2011-21-R0-en-us-20210108
No.
Description
Status
31
Spray boom balancing.
Selector switch [21] on the armrest.
71
Pushbutton [8] on the control lever.
80
Locked
Unlocked
32
-
-
33
-
-
34
∗
Filling program.
Pushbutton.
Press the button to go to the related screen page.
135
35
Filling valve.
Pushbutton.
Failure
36
Tank selection valve.
Pushbutton.
Failure
37
Agitation valve.
Pushbutton.
Failure
38
∗
Induction hopper valve.
Pushbutton.
Failure
39
Tank cleaning valve.
Pushbutton.
Failure
40
∗
Electric drain valve.
Pushbutton.
Failure
41
Spray flowmeter. The spray flowmeter measures
the spray liquid (GPM) during the spraying and
the circulation.
Pushbutton.
Press the button to go to the related screen page.
Содержание Condor C03
Страница 14: ...14 Condor UM 2011 21 R0 en us 20210108 ...
Страница 18: ...SAFETY 18 Condor UM 2011 21 R0 en us 20210108 ...
Страница 19: ...SAFETY Condor UM 2011 21 R0 en us 20210108 19 ...
Страница 54: ...START UP 54 Condor UM 2011 21 R0 en us 20210108 ...
Страница 79: ...OPERATION Condor UM 2011 21 R0 en us 20210108 79 No Description 27 28 Extra spray boom height UP DOWN Option ...
Страница 144: ...OPERATION 144 Condor UM 2011 21 R0 en us 20210108 ...
Страница 218: ...TROUBLESHOOTING 218 Condor UM 2011 21 R0 en us 20210108 ...
Страница 220: ...ENVIRONMENT 220 Condor UM 2011 21 R0 en us 20210108 ...
Страница 222: ...DISPOSAL PHASE 222 Condor UM 2011 21 R0 en us 20210108 ...
Страница 232: ...SPECIFICATIONS 232 Condor UM 2011 21 R0 en us 20210108 ...
Страница 233: ...APPENDICES Condor UM 2011 21 R0 en us 20210108 233 11 APPENDICES ...
Страница 248: ...APPENDICES 248 Condor UM 2011 21 R0 en us 20210108 ...