OPERATION
Condor-UM-2011-21-R0-en-us-20210108
121
Example 1
9
Main screen:
Step 1. Press the button [9]: spraying starts.
Step 2. Press the button [9]: spraying stops.
Turn at the headland and repeat the steps.
Example 2
9
[3]
[2]
[4]
[5]
[1]
Main screen:
Step 1. Press the button [9]: spray boom down.
Step 2. Press the button [9]: spraying starts / front-wheel steering.
Step 3. Press the button [9]: spraying stops / four-wheel steering / spray
boom up (60%).
Turn at the headland and repeat the steps.
Spray boom up: height setting (a percentage of the maximum height).
Press the button [1]. The numeric keypad [2] appears. Enter the percentage. If necessary, press
the button [3] for corrections. By pressing cancel [5], the numeric keypad disappears without mak-
ing any changes. Press the button [4] to confirm the value.
If the spray boom goes down in step 3, you must enter a higher percentage.
Содержание Condor C03
Страница 14: ...14 Condor UM 2011 21 R0 en us 20210108 ...
Страница 18: ...SAFETY 18 Condor UM 2011 21 R0 en us 20210108 ...
Страница 19: ...SAFETY Condor UM 2011 21 R0 en us 20210108 19 ...
Страница 54: ...START UP 54 Condor UM 2011 21 R0 en us 20210108 ...
Страница 79: ...OPERATION Condor UM 2011 21 R0 en us 20210108 79 No Description 27 28 Extra spray boom height UP DOWN Option ...
Страница 144: ...OPERATION 144 Condor UM 2011 21 R0 en us 20210108 ...
Страница 218: ...TROUBLESHOOTING 218 Condor UM 2011 21 R0 en us 20210108 ...
Страница 220: ...ENVIRONMENT 220 Condor UM 2011 21 R0 en us 20210108 ...
Страница 222: ...DISPOSAL PHASE 222 Condor UM 2011 21 R0 en us 20210108 ...
Страница 232: ...SPECIFICATIONS 232 Condor UM 2011 21 R0 en us 20210108 ...
Страница 233: ...APPENDICES Condor UM 2011 21 R0 en us 20210108 233 11 APPENDICES ...
Страница 248: ...APPENDICES 248 Condor UM 2011 21 R0 en us 20210108 ...