OPERATION
Condor-UM-2011-21-R0-en-us-20210108
137
12.
Press the button [11] for filling the spray
tank and the clean water tank with clean
water.
This screen page appears:
------
= Desired contents.
13.
To start or restart filling:
Press
. the button becomes green:
.
The main page appears when the tank is full.
To interrupt filling:
Press
. The button becomes gray:
.
To stop filling:
Press
. The filling stops and the previous
screen page appears.
The same buttons are present on the tank
screen. These buttons have the same func-
tions.
Содержание Condor C03
Страница 14: ...14 Condor UM 2011 21 R0 en us 20210108 ...
Страница 18: ...SAFETY 18 Condor UM 2011 21 R0 en us 20210108 ...
Страница 19: ...SAFETY Condor UM 2011 21 R0 en us 20210108 19 ...
Страница 54: ...START UP 54 Condor UM 2011 21 R0 en us 20210108 ...
Страница 79: ...OPERATION Condor UM 2011 21 R0 en us 20210108 79 No Description 27 28 Extra spray boom height UP DOWN Option ...
Страница 144: ...OPERATION 144 Condor UM 2011 21 R0 en us 20210108 ...
Страница 218: ...TROUBLESHOOTING 218 Condor UM 2011 21 R0 en us 20210108 ...
Страница 220: ...ENVIRONMENT 220 Condor UM 2011 21 R0 en us 20210108 ...
Страница 222: ...DISPOSAL PHASE 222 Condor UM 2011 21 R0 en us 20210108 ...
Страница 232: ...SPECIFICATIONS 232 Condor UM 2011 21 R0 en us 20210108 ...
Страница 233: ...APPENDICES Condor UM 2011 21 R0 en us 20210108 233 11 APPENDICES ...
Страница 248: ...APPENDICES 248 Condor UM 2011 21 R0 en us 20210108 ...