OPERATION
130
Condor-UM-2011-21-R0-en-us-20210108
No.
Description
Status
B/C
∗
Induction hopper.
Press the button below the symbol
to open
or close the induction hopper valve.
CLOSED
OPEN
Failure
B/C
Suction filter and pressure filter.
Cleaning or replacing the filter elements.
Do not clean or
replace the filter
elements
Clean or re-
place the filter
elements
195
196
Failure
C
∗
Filling program.
Display [C] appears after the filling program (op-
tion) is selected on the main screen in the cab.
Press the button below the symbol
to start or
interrupt the filing program. If the program is not
interrupted, the spray tank is filled to the desired
contents. The clean water tank is completely
filled.
Start / interrupt
135
Filling active
Failure
------
Desired con-
tents
∗
Option
Содержание Condor C03
Страница 14: ...14 Condor UM 2011 21 R0 en us 20210108 ...
Страница 18: ...SAFETY 18 Condor UM 2011 21 R0 en us 20210108 ...
Страница 19: ...SAFETY Condor UM 2011 21 R0 en us 20210108 19 ...
Страница 54: ...START UP 54 Condor UM 2011 21 R0 en us 20210108 ...
Страница 79: ...OPERATION Condor UM 2011 21 R0 en us 20210108 79 No Description 27 28 Extra spray boom height UP DOWN Option ...
Страница 144: ...OPERATION 144 Condor UM 2011 21 R0 en us 20210108 ...
Страница 218: ...TROUBLESHOOTING 218 Condor UM 2011 21 R0 en us 20210108 ...
Страница 220: ...ENVIRONMENT 220 Condor UM 2011 21 R0 en us 20210108 ...
Страница 222: ...DISPOSAL PHASE 222 Condor UM 2011 21 R0 en us 20210108 ...
Страница 232: ...SPECIFICATIONS 232 Condor UM 2011 21 R0 en us 20210108 ...
Страница 233: ...APPENDICES Condor UM 2011 21 R0 en us 20210108 233 11 APPENDICES ...
Страница 248: ...APPENDICES 248 Condor UM 2011 21 R0 en us 20210108 ...