Deployment Guide
65
M
OUNTING
THE
H
IVE
AP 340
Figure 14
Securing the HiveAP 340 to the hanger frame
7. Connect one or two Ethernet cables to the network, and—if not using PoE—connect the power cord to a power
source.
8. Replace the ceiling tile to complete the installation.
(bird’s eye view with the ceiling tiles
and ceiling tracks removed for clarity)
Insert the hanger clip upward
through the center slot in the
hanger frame.
Rotate the HiveAP 340 and the attached mounting accessories counterclockwise
until the clip locks in place against the sides of the crossbar.
HiveAP 340 attached to
the mounting plate
Hanger Frame
6
Содержание access point
Страница 1: ...Aerohive Deployment Guide ...
Страница 7: ...HiveAP Compliance Information 6 Aerohive ...
Страница 13: ...Contents 12 Aerohive ...
Страница 37: ...Chapter 2 The HiveAP 20 ag Platform 36 Aerohive ...
Страница 71: ...Chapter 4 The HiveAP 340 Platform 70 Aerohive ...
Страница 81: ...Chapter 5 The HiveAP 320 Platform 80 Aerohive ...
Страница 105: ...Chapter 8 The High Capacity HiveManager Platform 104 Aerohive ...
Страница 123: ...Chapter 10 Using HiveManager 122 Aerohive ...
Страница 209: ...Chapter 14 Deployment Examples CLI 208 Aerohive ...
Страница 217: ...Appenidix A Country Codes 216 Aerohive ...