Installation
40/ 122
Powerlift prefabricated pumping station
Î
Thread the coupling piece for the pump
onto the guide pipe: Position
X
.
X
Î
Lower the pump further until the
coupling sits in the underwater automatic
coupling.
Î
Hook the chain onto the chain holder.
Î
Protect the end of the pump connecting
cable against penetrating moisture.
Î
Pull the connecting cable upwards (not
while energised) until it reaches the chain
holder.
Î
Place the loop around the cable eye (
●
)
and fasten with cable tie.
Î
Hang the cable eye on the chain holder.
Î
Use the pull wire in order to pull the
connecting cable together with the level
sensor connecting cable through the
reserve cable duct up to the assembling
location of the control.
Î
Keep sufficient excess cable length
(approx. 1 m), to enable the wiring in the
terminal compartment of the control.
Î
Replace the cover.
This is the only way that enables the
submersible pumps to be removed and to be
stored to the side next to the tank opening.
●