For your safety
9/ 122
Powerlift prefabricated pumping station
1.6 Responsibility of the Owner
Due diligence in the owner’s, or the operator’s, area of responsibility:
ACO recommends that an operating log be kept and that inspections, servicing, maintenance
work, repairs etc. be documented, so that verification exists in case of an insurance claim.
Planning and installation
Requirements in accordance with the relevant standards and regional regulations must be
complied with, these include, among other things:
■
Layout and dimensioning
■
Protection against backflow
■
Installation of pipes
Operation monitoring
■
Monitoring normal operation,
Chapter 1.1 “Intended use”.
■
Monthly performance of at least 2 trial runs.
■
Controlling the prefabricated pumping station, e.g. unusual running noises of pumps.
■
Controlling the readiness of the prefabricated pumping station for operation on the
control system.
Maintenance
Wastewater lifting plants must be operated and maintained in such as way as to ensure proper
functioning and operating safety. We recommend that plant owners/operating companies
conclude a maintenance contract for the regular servicing and maintenance work to be
undertaken.
ACO Service would be pleased to undertake the servicing and maintenance work professionally.
Maintenance contract request [email protected].
Maintenance intervals for the prefabricated pumping station:
■
Commercial operation
= every 3 months
■
Operation in detached houses and multiple dwelling buildings =
every 6 months
Additional (unscheduled) servicing:
■
After flooding
■
Before putting back into service