Installation
39/ 122
Powerlift prefabricated pumping station
3.4.2 Assembling the chain holder and guide pipe
In the as-delivered condition, a chain holder with fixing material is enclosed as a loose part. The
guide pipe (metre goods) can be optionally purchased from ACO.
Requirement: The chain holder should be assembled centrally in the cover plate according to the
height.
Î
Attach the guide pipe on the glide pipe
and align it as vertical.
Î
Insert the chain holder on the guide pipe
and mark the drill holes on the cover
plate.
Î
Fasten the chain holder on the marked
position.
3.4.3 Installing the submersible pumps
Submersible pumps with assembled coupling pieces are integral parts of the basic equipment
and must be selected according to the operating conditions and are supplied loose. 2 cable lugs
are additionally included as loose.
Pump pull chains (metre goods) and shackle can be optionally purchased from ACO.
The description applies to both submersible pumps:
Î
Assemble the chain with shackle on the
handle of the pump and/or
lay the chain around the pump handle
and connect two chain links with the
shackle.
Î
Lift the cover out of the cover frame and
store to the side.
Î
Use the chain to lower the pump into the
tank.