Commissioning
61/ 122
Powerlift prefabricated pumping station
4 Commissioning
Based on the normative requirements (EN 12056-4), the start-up must be carried out by an
appropriately competent person.
The commissioning must be documented, Appendix: “Commissioning record”.
4.1 MultiControl Duo control
Will be utilised in combination with the following pumps, Chapter 2.1.2 “Accessories”.
4.1.1 Controls and display elements
Anzeige
Störung
Pumpe 1 Pumpe 2
Betrieb
Nachlauf
Automatik
Handbetrieb
Hochwasser-
Alarm
MultiControl Duo
Auswahl
Quittung
HAND
0
AUTO
Pumpe 1 Pumpe 2
10
9
8
7
1
2
3
4
5
6
1 = Display panel
2 = Rotary knob: Select menu items
3 = Button: Manual mode AN P1 and/or P2
4 = Button: Operation OFF P1 and/or P2
5 = Button: Acknowledgement of the malfunction/value
settings
6 = Button: Automatic mode AN P1 and/or P2
7 = LED illuminates: Automatic mode P1 and/or P2
LED flashes: Manual mode P1 and/or P2
LED flashes irregularly: Manual mode will be
terminated automatically after approx. 2 minutes.
8 = LED illuminates: Mode P1 and/or P2
LED flashes: After run P1 and/or P2
9 = LED illuminates: Malfunction flooding alarm
10 = LED illuminates: Automatic malfunction P1 and/or
P2