4/ 122
Powerlift prefabricated pumping station
3.5 Electrical installation ......................................................................................... 54
3.5.1 Overview of the electrical installation work .............................................. 54
3.5.2 Supplying heating (optional) and work plug socket (optional) with current .. 55
3.5.3 Installing the control .............................................................................. 55
3.5.4 Connecting the control to the power supply ............................................ 55
3.5.5 Connections for the control ................................................................... 56
3.5.6 Connecting and clamping the connecting cables of
the pumps and level sensors ................................................................. 56
3.5.7 Check the rotational direction of the pumps ............................................ 58
3.5.8 Connecting the control cable (optional) ................................................... 58
3.5.9 Connecting the air bubble injection ......................................................... 59
3.5.10 Connecting the malfunction or fault signalling equipment (optional) ........... 60
3.5.11 Installing ex-barrier ................................................................................ 60
4 Commissioning .............................................................................................. 61
4.1 MultiControl Duo control .................................................................................... 61
4.1.1 Controls and display elements ............................................................... 61
4.1.2 Menu items and settings ....................................................................... 63
4.1.3 Changing the settings ........................................................................... 65
4.2 Level Control PS 2 Control System .................................................................... 65
4.2.1 Controls and display elements ............................................................... 65
4.2.2 Menu items and settings ....................................................................... 67
4.2.3 Changing the settings ........................................................................... 69
4.3 Commissioning settings .................................................................................... 69
4.3.1 Powerlift PSD-P-1000 with T
Basin
= 685 .................................................. 70
4.3.2 Powerlift PSD-B-1000 with T
Basin
= 480 ................................................. 71
4.3.3 Powerlift PSD-B-1000 with T
Basin
= 1070 ............................................... 72
4.3.4 Powerlift PSD-B-1500 with T
Basin
= 395 ................................................. 73
4.3.5 Powerlift PSD-B-1500 with T
Basin
= 795 ................................................. 74
4.3.6 Powerlift PSD-B-2200 with T
Basin
= 515 ................................................. 75
4.3.7 Powerlift PSD-B-2200 with T
Basin
= 505 ................................................. 76
4.3.8 Powerlift PSD-B-2200 with T
Basin
= 585 ................................................. 78
4.3.9 Settings for the installed prefabricated pump station ............................... 79
4.4 Starting up the submersible pumps .................................................................... 80
4.5 Execute test run ............................................................................................... 81
4.6 Setting the air bubble injection (optional) ............................................................ 85
5 Troubleshooting ............................................................................................. 86
Table of Contents