![ACO Powerlift Concrete Скачать руководство пользователя страница 72](http://html1.mh-extra.com/html/aco/powerlift-concrete/powerlift-concrete_instructions-for-use-manual_459519072.webp)
Commissioning
72/ 122
Powerlift prefabricated pumping station
4.3.3 Powerlift PSD-B-1000 with T
Basin
= 1070
Menu
point
Unit
Pump type
Settings with level sensor:
A
+
B
C
D
E
AL
PL
BL
OFF
AL
PL
BL
OFF
AL
*
PL
*
BL
*
OFF
*
Flood AL
=
AL
Peak load
ON =
SL
Base load
ON =
BL
Base load
OFF =
OFF
cm
SAT-100/D
42 32 22 11 60 50 40 18
–
42 32 22 11
SAT-150/D
42 32 22 11 60 50 40 11
42 32 22 11
SAT-200/D
42 32 22 11 60 50 40 11
42 32 22 11
SAT-50/2/32/D
42 32 22 11 60 50 40 11
42 32 22 11
SAT-75/2/32/D
42 32 22 11 60 50 40 11
42 32 22 11
SAT-V 75/2/50/D
37 27 17 11 60 50 40 11
37 27 17 11
SAT-V 150/2/50/D
37 27 17 11 60 50 40 11
37 27 17 11
SITA 150 N-ex
40 30 20 11 60 50 40 11
40 30 20 11
SITA 200 N-ex
40 30 20 11 60 50 40 11
40 30 20 11
SITA 300 N-ex
31 29 27
5
60 50 40 11
31 29 27
5
SITA 550 N-ex
24 22 20
5
60 50 40 11
24 22 20
5
After-running
period
s
0
**
0
0
0
Maximum
current
– 1
***
Maximum
current
– 2
***
A
SAT-100/D
2.3
SAT-150/D
2.7
SAT-200/D
3.6
SAT-50/2/32/D
1.1
SAT-75/2/32/D
1.3
SAT-V 75/2/50/D
1.3
SAT-V 150/2/50/D
2.6
SITA 150 N-ex
2.9
SITA 200 N-ex
3.7
SITA 300 N-ex
5.1
SITA 550 N-ex
8.7
Level
control
–
Internal converter
Float
switch
4-20mA
interface
20 mA =>
level
cm
–
–
–
400
Language
–
German
*
Previously set under “level control” menu item = Set
4-20mA Interface
“and under”
20 mA => Level =
400
.
**
Value = 0 with version with air bubble injection. With version without air bubble injection, value assessment
during trial run: Water level must remain approx. 5 cm under lower edge of back pressure hole.
***
With Level Control PS 2 Control System: Setting via separate motor protection switch.