Installation
26/ 122
Powerlift prefabricated pumping station
3.3.4 Installing shaft components with PSD-P
Shaft rings with connection collars, cover plate, support rings, cover and adhesive are supplied
loose.
IMPORTANT
■
All joints must be sealed with the supplied 2-component adhesive.
■
Transport eyes on the shaft components are designed for their own weight load. Do not
transport with other shaft components placed on top.
Specifications:
■
Both adhesive surfaces
(e.g.
circumferential upper edge of the base
shaft and circumferential collar base of
the shaft ring) must be machined (e.g.
with angle grinder and grinding disc)
in order to obtain a release agent-free
adhesive surface.
■
Adhesive surfaces must be clean,
dry and free of grease and oil before
bonding.
■
Mixing of the 2-component adhesive,
documentation accompanying the
product.
■
Apply the adhesive over the entire
surface and conically (approx. 10 mm in
the tip) all around on the upper adhesive
surface area of every component.
ca.
10 mm
■
The adhesive mass should squeeze
out circumferentially to the inside after
the components have been positioned.
Smooth out any excess or protruding
material and fill any gaps in the joint flush
with the adhesive.