Installation
58/ 122
Powerlift prefabricated pumping station
■
Extending the cable of the FMX 21 level probe:
Always calculate the required cable cross-section.
Connection cable for the supplied level probe: 3 x 0.2 mm² (3 x 26 AWG) plus
pressure compensation hose with Teflon filter. The pressure compensation hose must
not be sealed in a gel collar or cast resin collar. A suitable cable connection box with
membrane must be utilised e.g. ACO Article Number 711892.
Î
Insert the connection cable into the terminal compartment of the control and connect to
the electrical system.
3.5.7 Check the rotational direction of the pumps
IMPORTANT
The rotational direction is
correct, i.e. clockwise, if the protective cover
(2) moves as shown (1).
Î
Control the rotational direction: Switch on
pump and switch off again immediately.
Observe the starting recoil carefully from
the motor side.
1
2
3.5.8 Connecting the control cable (optional)
IMPORTANT
To prevent malfunctions:
■
Always lay the control cable for the control system as rising, kink-free and frost-resistant
(lay, e.g. in a reserve cable conduit of at least DN 50).
■
Use a cutter to adjust the control cable length at right angles.
■
Only connect the control cable to the MultiControl Duo Control when the open back
pressure bell is not hanging in the water.
Î
At the control (1), unscrew the union nut
(4) from the compression fitting (2) and
push over the control cable (5).
Î
Push the control cable (5) onto the bush
(3).
Î
Twist the union nut (4) onto the
compression fitting (2) and tighten
hand-tight.
Anzeige
Störung
Pumpe 1 Pumpe 2
Betrieb
Nachlauf
Automatik
Handbetrieb
Hochwasser-
Alarm
MultiControl Duo
Auswahl
Quittung
HAND
0
AUTO
Pumpe 1 Pumpe 2
1
2
3
4
5