![ACO Powerlift Concrete Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/aco/powerlift-concrete/powerlift-concrete_instructions-for-use-manual_459519021.webp)
Installation
21/ 122
Powerlift prefabricated pumping station
3 Installation
The specifications of EN 12056-4 and the regional directives must be complied with for
the installation. Following installation, the launch must be carried out by a qualified person,
according to the requirements in these instructions for use, Chapter 4 “Commissioning”.
IMPORTANT
Assure required qualifications of personnel,
Chapter 1.3 "Personnel
qualifications".
3.1 Installation example (schematic diagram)
The example shows the installation of a prefabricated pumping station for draining a car park.
The components used can differ, depending on the installation situation.
1
2
3
4
5
6
11
10
9
8
7
1 = Channel (optional)
2 = On-site ventilation line
3 = Outdoor cabinet (optional)
4 = On-site backflow loop
5 = Road gully (optional)
6 = Backflow level
7 = On-site sewer
8 = On-site pressure pipe
9 = On-site cable duct
10 = Prefabricated pumping station (e.g. Powerlift-
PSD-B-1500)
11 = On-site inlet pipe