Commissioning
79/ 122
Powerlift prefabricated pumping station
4.3.9 Settings for the installed prefabricated pump station
The settings made during the commissioning must be entered in the following table by hand.
Menu item
Unit
Pump type
Settings with level sensor:
A
B
C
D
E
Base load ON
cm
Base load OFF
cm
Peak load ON
cm
Flood AL
cm
After-running
period
s
0
0
0
0
Maximum current
– 1
***
Maximum current
– 2
***
A
Level control
–
Internal converter
Float
switch
4-20mA
interface
20 mA => level
cm
–
–
–
–
400
Language
–
German
***
With Level Control PS 2 Control System: Setting via separate motor protection switch.