EDA-Z5008, Z5020 & Z5100 – Technical Manual
ZPControlTechMan_r105
_____________________________________________________________________________________________________
3
Introduction
Electro Detectors has been manufacturing radio fire alarm systems since 1987 and with the
introduction of a harmonised specification for Europe has complemented its range of products to meet
EN54 Part 25. Based on the popular Zerio system, the Zerio Plus has been designed to be capable of
handling 240 devices in 100 zones. Typical installations would include small offices, private houses,
HMO’s, guesthouses and small hotels.
This manual contains information to enable an engineer to install, service and operate the Zerio Plus
control panel and the range of Zerio Plus devices. This product should be installed, commissioned and
maintained by qualified service personnel in accordance with codes of practice, statutory requirements
and IEE regulations for electrical equipment in buildings.
The system has been designed to allow very simple set up, with a user friendly menu structure and full-
text capability. There is no need to connect devices with a programming lead, as configuration is
achieved by radio. Text locations can be entered on the panel itself or by connecting a standard USB
keyboard to the panel.
Devices for the system are visually the same as the standard Millennium and Zerio devices. These
devices are not compatible with the Millennium or Zerio range of fire alarm equipment. A list of
devices available for use with this system can be found on the back page.
Prior to installation, the building where the system is to be installed must be surveyed to ensure that
each device to be fitted has a good radio communication path to the control or booster panel. This is
done with an EDA-Z5000 survey kit. When installing devices, they must be positioned as per the survey.
Installing a device even a few inches from the surveyed position can affect the signal strength
significantly, especially if any metalwork is contained in the ceiling above the new position (e.g. air-
conditioning ducting).
IMPORTANT
Failure to perform an accurate survey could result in the system being unreliable. These
errors can be costly to correct.
Position the panel where it is to be installed.
Ensure devices are surveyed for their exact positions touching the ceiling or wall.
A few inches either side may substantially affect the signal strength.
In order to have an accurate survey the batteries in the survey detector should be
changed at least once a year.