ST950S Plus+ Installation and Commissioning Manual
Important:
The PDU and Wait Indicator require a separate Earth wire to be fed from the Pole Top
Earth Terminal or other Pole Earth points (sometimes derived from the CET gland on the
armoured cable termination) and connected to the earth terminal on the PDU or Wait Indicator
equipment.
Figure 45. PDU Internal Connections
4.4.1. Audible and Tactile Connections
With reference to
, the connections for the tactile and audible devices can be
found along the top edge (bottom edge when door open).
Audibles are connected to ‘Loud’ as standard, unless specified otherwise.
4.4.2. Parts
Plus+ Wait/PDU PCB Assembly 667/1/53150/001
Page 87