ST950S Plus+ Installation and Commissioning Manual
Full details of this process are given in the ST950 User Interface Handbook 667/HU/46000/000.
6.9.4. Loading Plus
+
Site Layout Configuration
The ST950 Plus
+
controller requires a Plus
+
Site Layout configuration to be loaded for correct
operation. The configuration is loaded as follows;
•
First select the configuration file using the Status and Configuration → Plus
+
→ Import Site
Layout web page:
•
Select the configuration to be imported using the
Browse
button.
•
Press the
Save
button to load the configuration.
Review the changes which would be applied to the system by the new configuration using the Status
and Configuration → Plus+ → Review Site Layout Import web page:
•
Press the
Merge Site Layout
button to accept the changes.
•
Press the
Reject Merge
button to reject the change.
The controller will need to be power cycled after pressing the
Merge Site Layout
button:
6.9.5. Reviewing Plus+ Site Layout Discrepancies
Important:
For the controller to be functional the site layout will need to be fully completed i.e. the Nodes’
serial numbers will need to have been added to the configuration. It is recommended that this
is completed before importing the Plus+ Site Layout, by using the ‘Installation App’. Refer to
the ST950 Plus+ Installation App Quick Start Guide (667/HQ/53000/300)
Discrepancies between the Plus+ Site Layout and the discovered Plus+ equipment can be reviewed
using the Status and Configuration → Plus+ → Discrepancy Report web page.
If it is necessary to delete the Site Layout then this can be done using the Status and Configuration →
Plus+ → Delete Site Layout web page.
6.9.6. Loading New Plus
+
Firmware
If new firmware is required please refer to
Plus+ Firmware Upgrade Procedures
6.9.7. Loading Licences
The ST950 requires licences to be fitted before certain facilities can be used. The facilities which are
currently licensed are listed below.
Table 40. Feature Licences
Part Number
Licence Description
667/1/47560/000
LIGHTWEIGHT TUNNEL