ST950S Plus+ Installation and Commissioning Manual
Important:
It is not necessary to set the System time when the profile is set to
Stratos
.
Important:
If NTP is used, the time may not be the actual time but that used by the system (In-Station
time)
Important:
If CLF plans are to be used it is important that the clock be set accurately to ensure that the
plans operate as expected.
The Handset can also be used to set the Real Time Clock using Level 3 access and the 'TOD='
command, for example:
'TOD=21AUG13' to set the Date and
'TOD=10:36:00' to set the time
6.9.12. Lamp Testing
The ability to test individual lamps is an important facility that allows faults to be identified easily and
rectified.
At first commissioning or whenever major changes are made to the site signalling equipment a full
lamps test must be performed to verify that all lamps are operating correctly.
The inbuilt self-test facility can be used to illuminate each aspect in turn or the lamp test facility that
allows individual aspects to be illuminated is provided via the web page:
•
Status and Configuration → Controller → Phases → Lamp Test
To use this facility level 3 access is required and the signals on/off switch MUST be in the OFF position.
Important:
All aspects under test must be covered.
The aspect to be tested is identified and the following information entered into the web page:
•
Phase
•
Aspect Colour
•
Duration of Test in seconds
•
Once this information has been entered, press the 'Submit' and 'Confirm' buttons to start the
test. The remaining time for the test is displayed against 'Progress'.
•
The RS232 Handset 'LMP' command can also be used for lamp testing.