Warm-up operation and regular operation
Procedure
(1) Turn ON the power.
The IR810G turns on when the power supply is connected.
The measurement screen appears on the front display panel.
(2) Warm-up operation for about 4 hours
(3) See 5. SCREENS to make the necessary settings.
(4) Perform zero/span calibration after the warm-up operation (see 5.4 Calibration and
(5) Introduce the measurement gas into the IR800G/IR810G and start measurement.