IM 11G06A01-02EN
3-2
3. INSTALLATION
1st Edition : Oct. 27, 2023-00
To install the analyzer for optimum performance, select a location that meets the following
conditions;
• IR800G/IR810G is system built-in type, embedded in a steel rack, or enclosure of steel
sheet.
Keep a minimum clearance of 10 cm above the analyzer for heat dissipation. The same
size of clearance is required for each analyzer when you install several units on a multistage
rack.
• Install the external switch or the Circuit breaker in the same room where the IR800G/
IR810G is installed. Place it where the operator can access and indicate that it is the power
switch of the IR800G/IR810G.
3.2 Installation
The next table shows the type of mounting and its code of equipment.
Rack-mounting type of equipment can be installed with sliding rails.
Mounting type (Code)
IR800G
IR810G
Rack-mounting with sliding
rails (-S)
Rack-mounting (-R)
Panel-mounting (-P)
Wall-mounting (-W)
Follow the next instruction and install equipment properly.
• Front side of equipment must stand vertically.
• Support the mass of R800G at the bottom of the case (e.g., with support).
• If installing the unit in a location where vibration is unavoidable, put rubber or other vibration-
absorbing materials in the mounting area (between the support and the main unit, and at the
contact area between the front perimeter and the panel).