8-39
IM AQ1210-01EN
Using the
Application Feature
1
2
3
4
5
6
7
8
9
10
11
App
Index
Multicore Loss Test Screen
Master
Slave
Before loading project conditions (setup)
After loading project conditions (setup)
A screen for executing multicore loss tests
Project condition status
Project condition status
• Project Condition Status
Before starting a multicore loss test, set the conditions (e.g., number of cores) of the multi-core
fiber cable to be measured. The project conditions are created on the master side and then sent
to the slave side.
On the slave side, the project conditions sent from the master side are received and loaded into
the instrument.
Setting: Indicates that the master and slave are being selected or the project information is
being created.
Sending: Indicates that the project conditions are being sent from the matter side to the
slave side.
Receiving: Indicates that the project conditions sent from the master side are being received
on the slave side.
Complete: Indicates that the transmission of the project conditions has been completed
between the master side and slave side. After completion, a screen appears for
executing multicore loss tests.
8.4 Performing a Multicore Loss Test (Multicore Loss Test)