YL9111 Binary Pump
4-3-4. Measures when not uses for long time
1) Prepare iso-propanol for analysis.
2) Open prime/purge pump and suck iso-propanol of at least 50ml into instrument.
3) Separate outlet tubing of pump.
4) Press out iso-propanol sucked into syringe in prime/purge valve and discharge at least 5ml into
outlet of in-line filter.
5) Separate mobile phase filter assembly and block discharge hole and suction hole with cap.
4-4. YL-Clarity Chromatograph software
4-4-1.Installation of pump
Open YL-Clarity software and select Configuration on the main window. On the system configuration
window, click [ADD] button and select YL911x.
18
Summary of Contents for YL9100 HPLC
Page 1: ......
Page 2: ...YL9100 HPLC SYSTEM YL9101 VACUUM DEGASSER USER MANUAL...
Page 9: ...YL9100 HPLC SYSTEM YL9110 QUATERNARY SOLVENT DELIVERY PUMP USER MANUAL...
Page 44: ...YL9100 HPLC SYSTEM YL9111 BINARY PUMP USER MANUAL...
Page 79: ...YL9100 HPLC SYSTEM YL9112 ISOCRATIC PUMP USER MANUAL...
Page 114: ...YL9100 HPLC System YL9120 UV Vis Detector USER MANUAL...
Page 136: ...YL9100 HPLC SYSTEM YL9130 COLUMN COMPARTMENT USER MANUAL...
Page 150: ...YL9100 HPLC SYSTEM YL9160 PDA Detector USER MANUAL...
Page 169: ...YL9100 HPLC System YL9170 RI Detector USER MANUAL...
Page 188: ......