
13
2. Before Using
Preparation before operation
(14)
Precautions for drainage
Before draining the water, make sure that the pressure, equipment temperature and water
temperature inside the chamber have decreased sufficiently.
(15)
Precautions for continuous operation
When operating the equipment continuously after sterilization is completed, leave the
equipment for about 15 minutes with the cover opened to sufficiently lower the
temperature inside the chamber and then close the cover. If the temperature is high, the
cover may not close due to high internal pressure of chamber caused by residual steam.
Before operating the equipment, check the water level of cooling water box is lower than
water level lower limit at 1-2mm.
In case the water level of water box is above the drain level seal, drain the water until the
water level comes to the water level gauge scale.
The hot water or vapor may blow out from the cooling water box if the equipment is
operated with too much drain water (above the seal position).