EMU00174
Chapter 3
OPERATION
E
INSTALLATION
.......................................3-1
Mounting the outboard motor................3-2
BREAKING IN (RUNNING IN)
ENGINE
...................................................3-5
PRE-OPERATION CHECKS
...................3-6
Operation after a long period of
storage..................................................3-8
FILLING FUEL AND ENGINE OIL
..........3-9
Filling fuel..............................................3-9
Filling oil................................................3-9
STARTING ENGINE
..............................3-12
WARMING UP ENGINE
........................3-15
SHIFTING
..............................................3-16
Forward...............................................3-16
Reverse...............................................3-16
STOPPING ENGINE
.............................3-17
TRIMMING OUTBOARD MOTOR
.........3-18
Adjusting trim angle ............................3-19
TILTING UP/DOWN
...............................3-21
CRUISING IN OTHER CONDITIONS
...3-24
Cruising in salt water ..........................3-24
Cruising in turbid water .......................3-24
60V-9-71-A0-3 8/21/02 17:01 Page 2
Summary of Contents for LZ250D
Page 107: ... MEMO 60V 9 71 A0 3 8 21 02 17 01 Page 27 ...
Page 157: ... MEMO 60V 9 71 A0 4 8 23 02 10 41 Page 25 ...
Page 207: ...E 5 4 MEMO 60V 9 71 A0 5 8 1 02 3 39 PM Page 7 ...
Page 226: ...EMU00450 Chapter 6 INDEX E INDEX 6 1 60V 9 71 A0 6 8 1 02 4 56 PM Page 2 ...
Page 234: ...67K 9 14 1 2 28 02 11 23 AM Page 2 ...