Operation Tests
1. Block Nozzle Array of Printhead with lint free wipe.
2. Configure photocell as designed during site survey.
3. Block photocell with product sample and adjust gain adjustment
until LED on back of photocell flashes at a high frequency.
4. Remove product sample and adjust photocell gain adjustment 2
(two) turns counter-clockwise. LED should go out. (Light
colored products may require angling photocell beam 15 degrees
form perpendicular to product.)
5. Block photocell with product sample again and verify that P/C
LED on CPU board flashes.
6. Pull encoder wheel (if installed) away from conveyor line and
rotate wheel. Ensure that EN LED on CPU PCB flashes or
lights.
6-16
Installation & Setup
Figure 6-7
Summary of Contents for 6100
Page 8: ...This page intentionally left blank...
Page 18: ...2 8 Application Design This page intentionally left blank...
Page 21: ...Dimensions Controller Application Design 2 11...
Page 22: ...Integrated Printhead Wax System 2 12 Application Design...
Page 55: ...Command Definitions 5 21...
Page 56: ...5 22 Command Definitions This page intentionally left blank...
Page 70: ...6 14 Installation Setup Figure 6 6...
Page 87: ...7 8 Service Figure 7 1...
Page 89: ...7 10 Service Figure 7 2...
Page 95: ...7 16 Service Figure 7 3...
Page 97: ...7 18 Service This page intentionally left blank...
Page 115: ...8 18 Removal Replacement Procedures Figure 8 7...
Page 125: ...8 28 Removal Replacement Procedures This page intentionally left blank...