Installation
1. Install heater hose at wax reservoir fitting. Tighten finger tight.
2. It may be necessary to melt wax residue in tank fitting with a hot
air gun so that heater hose seats properly.
3. Support Printhead Assembly and install heater hose to print
head fitting. Tighten finger tight.
4. Reinstall print head onto mounting bracket and secure.
5. Connect heater hose wires and re-install insulating foam and top
plate. Re-install housing cover.
6. Secure housing cover with screws and install rotational
mounting bracket.
7. Tighten heater hose line nuts 1 ¼ turn.
8. Allow system to heat to operating temperature and check for
leaks at fittings.
9. If leaking occurs, tighten fittings ¼ turn at a time until leaking
stops.
10. Prime air out of system until a steady stream of wax flows
through the nozzle plate.
11. Perform test prints and return system to service.
Removal/Replacement Procedures
8-27
Summary of Contents for 6100
Page 8: ...This page intentionally left blank...
Page 18: ...2 8 Application Design This page intentionally left blank...
Page 21: ...Dimensions Controller Application Design 2 11...
Page 22: ...Integrated Printhead Wax System 2 12 Application Design...
Page 55: ...Command Definitions 5 21...
Page 56: ...5 22 Command Definitions This page intentionally left blank...
Page 70: ...6 14 Installation Setup Figure 6 6...
Page 87: ...7 8 Service Figure 7 1...
Page 89: ...7 10 Service Figure 7 2...
Page 95: ...7 16 Service Figure 7 3...
Page 97: ...7 18 Service This page intentionally left blank...
Page 115: ...8 18 Removal Replacement Procedures Figure 8 7...
Page 125: ...8 28 Removal Replacement Procedures This page intentionally left blank...