10.2.3 Sea Trial - Commissioning Step 10: Side Lobe Levels
Before this test can be done the WASSP system must be operating at the correct power level.
Set the WASSP system to use Automatic Power, double click the power level display so that it
turns green.
Ensure that
Automatic Power By Signal
is selected in the
Ship Setup Options - Power Tab.
Wait until the blue power level display is set to at least 2.
On the
Menu Task Bar
, double click on the
Gain Control Knob
to open the
Advanced
Options
controls. Move this window so that you can adjust the Minimisation while watching the
sonar display area above the seafloor change. Look at the pictures in “Figure 46. Side Lobe
Levels”.
Note: Commissioning Step 10 is also
required for the seafloor detection
process to operate correctly.
1
2
3