Only for type WWC: Filling the primary and the intermediate
circuit and checking the pressure
1. Only for commissioning:
Flush the primary and the inter-
mediate circuit.
2. Only for commissioning:
Fill and vent the primary circuit.
3. Only for commissioning:
Fill the intermediate circuit with
heat transfer medium "Tyfocor -15 °
C" and vent the circuit.
4.
Check the pressure of the inter-
mediate circuit. The pressure
should be approx. 2 bar.
5.
Check the inlet pressure of the dia-
phragm expansion vessel and
adjust, if required (see page 43).
Checking the input terminals and contactors
Check the voltage and cycle at the
power supply, at the input terminals
and at the contactors.
Voltage: 400 V 3
∼
Rotating field: clockwise
If the phase asymmetry fault indicator
illuminates on the phase monitor (see
page), swap phases L1 and L3.
System configuration
Enable the system design used (see from page 9) and any optional components
or functions at the control unit.
Only required outside German-speaking countries: Setting the display lan-
guage
1.
Open cover of programming unit
(see page 57 and operating instruc-
tions).
Further details regarding the individual steps
(cont.)
45
Commissioning, inspection, maintenance
55
92
901
GB
Service
Summary of Contents for VITOCAL 300
Page 19: ...Connection diagram Open CLOSE System version 1 cont 19 Preparing for installation 5592 901 GB...
Page 22: ...Connection diagram Open CLOSE System version 2 cont 22 Preparing for installation 5592 901 GB...
Page 137: ...Control PCB 137 Connection and wiring diagrams 5592 901 GB Service...
Page 140: ...Parts lists cont 140 Parts lists 5592 901 GB...
Page 141: ...Parts lists cont 141 Parts lists 5592 901 GB Service...
Page 159: ...159 5592 901 GB...