Setting parameters
Setting range
Standard
setting
Commission-
ing
Primary pump ON for
NC
No/Yes
Yes
Heat pump
Max. flow temperature
25 to 60 °C
55 °C
Min. compressor off
00:20 to 30:00 min
10:00 min-
utes
Min. runtime
2:00 to 30:00 min
2:00 minutes
Optimum runtime
00:20 to 18:00 h
2:00 h
Min. return tempera-
ture
1 to 40 °C
5 °C
Hysteresis T brine
1 to 20 K
5 K
Min. T primary in
-10 to 20 °C
–
4 °C
Primary pump flow
00:10 to 16:40 min
2:00 minutes
Secondary pump flow
00:10 to 16:40 min
2:00 minutes
Electric heater
Power-OFF
No/Yes
Yes
Heating with electric
power
No/Yes
Yes
Max. flow temperature
5 to 75 °C
65 °C
Heater rod delay
0:00 to 5:00 h
0:30 h
Electric heating
threshold
10 to 30000 K
∙
min
300 K
∙
min
E-heating max. stage
1 to 3
3
Power failure OFF
time
00:00 to 18:00 h
0:00 h
Failure OFF stage
1 to 3
1
Stage for power-OFF
1 to 3
1
Internal hydraulics
Heat pump for drying
buildings
No/Yes
No
Time for drying build-
ings
0 to 30 days
0 Days
("OFF")
Ext. heat source for
drying buildings
No/Yes
Yes
Flow hysteresis
0.5 to 5.0 K
2.0 K
Internal pump run-on
00:10 to 05:00 min
02:00 min-
utes
DHW
DHW cylinder tem-
perature
10 to 70 °C
50 °C
Reports of control parameters
(cont.)
144
Commissioning/service reports
55
92
901
GB
Summary of Contents for VITOCAL 300
Page 19: ...Connection diagram Open CLOSE System version 1 cont 19 Preparing for installation 5592 901 GB...
Page 22: ...Connection diagram Open CLOSE System version 2 cont 22 Preparing for installation 5592 901 GB...
Page 137: ...Control PCB 137 Connection and wiring diagrams 5592 901 GB Service...
Page 140: ...Parts lists cont 140 Parts lists 5592 901 GB...
Page 141: ...Parts lists cont 141 Parts lists 5592 901 GB Service...
Page 159: ...159 5592 901 GB...