DOC: 03-925914-01/02
DESC: Micro - TCD Installation
PAGE:
REV
3 of 3
1
PREPARED BY: Sax Makthepharack REVISED BY:
CONTROL: INDUSTRIAL ENGINEERING
REV. DATE:
SHOWN
-
03 - 10 - 00
Michael Slaughter
INSTALLATION OF MICRO-TCD:
1. ENSURE GC OVEN INSULATION IS CAREFULLY WRAPPED UNDER AND
AROUND, THE MICRO-TCD TO PREVENT COLUMN OVEN CONDITIONS
COUPLING WITH DETECTOR.
2. FEED HEATER AND PROBE TO LOCATION ON PWA’S
- HEATER TO ZONE ON POWER PWA.
- PROBE TO ZONE ON MAIN PWA.
3. INSTALL MICRO-TCD PWA BOARD (03-925904-01) AND SECURE. ROUTE FLAT,
RIBBON CABLE FROM MICRO-TCD ALONGSIDE PNEUMATICS BULKHEAD AND
AROUND TO MICRO-TCD PWA BOARD. SECURE WITH CABLE CLAMP.
03-925904-01
MICRO-TCD PWA
HEATER CONNECTOR ZONE
PROBE CONNECTOR ZONE
03-925914-11/12
MICRO-TCD SUB-ASSEMBLY