DOC: 03-925609-00
DESC:
PAGE:
REV
8 of 17
Assembly Procedure
3
PREPARED BY: Sax Makthepharack REVISED BY:
CONTROL: INDUSTRIAL ENGINEERING
REV. DATE:
SHOWN
-
02 - 03 - 00
Sax Makthepharack
NOTES: (UNLESS OTHERWISE SPECIFIELD
1. CONNECT FLAT CABLE.
2. CONNECT DEFC CARRIER INLET(s) TO TEST BENCH CARRIER INLET (MANIFOLD WITH CROSS
“T” IF REQUIRED)
3. CONNECT DEFC CARRIER OUTLET(S) TO TEST BENCH CARRIER OUTLET (MANIFOLD WITH
CROSS OR “T”, IF REQUIRED).
4. PLUG PRESSURE SENSOR ON TEST STAND.
DEFC P/N
CARRIER IN
CARRIER OUT
1
1
2
4
5
6
3
ITM
7
3
2
1
4
2
1
(03-925609-XX)
-01, -02 & -05
(FID, TSD, PFPD)
1, 3 & 5
4, 6 & 7
2
-04 & -06
(TCD, TCD
(H2)
)
1 & 3
2 & 4
3
-03
(ECD)
1
2
5. JUMP SPLIT VALVE TO VENT ON TEST STAND.
TEST AND CALIBRATION PROCEDURE DETECTOR EFC