DOC: 03-925609-00
DESC:
PAGE:
REV
5 of 17
Assembly Procedure
3
PREPARED BY: Sax Makthepharack REVISED BY:
CONTROL: INDUSTRIAL ENGINEERING
REV. DATE:
SHOWN
-
02 - 03 - 00
Sax Makthepharack
14-202004-00, 2 PLCS
WASHER SPLIT #4
12-222004-22, 2 PLCS
SCREW, 4-40 X 1-1/4
03-925695-01
VALVE, PROPORTIONAL
NOTES: (UNLESS OTHERWISE SPECIFIED)
1. ORIENT VALVE CABLES.
4. AFTER VALVES & MOUNTING PLATE ASSEMBLED TO BLOCK,
TORQUE SCREWS FROM PREVIOUS SHEET HAND TIGHT..
5. INSTALL COVER (WITH TIE WRAP) AND LABEL FOR J8.
03-925569-01
PLATE, MTG
14-202006-00, 2 PLCS
WASHER, SPLIT #6
12-222006-04, 2 PLCS
SCREW, 6-32 X 1/4
6. MOUNT CATIPILLAR STRIP TO BRACKET.
2. MOUNT VALVES & MOUNTING PLATE TO BLOCK ONE AT A TIME.
3. ASSEMBLE PWA TO MOUNTING PLATE SCREWS.
LABEL
TIE WRAP
24-389071-00, 2-1/2” LG
GROMMET GTRIP