SECTION 6
OPERATION
40
6
6.2
Startup Preparation
NOTICE
When turning the POWER switch ON or OFF, a "clunk" sound may be heard from inside the
pump. This sound is from the rotor inside the pump being levitated or de-levitated. This is normal.
6.2.1 Start-up Preparation Sequence in LOCAL Mode
(1) Feed the cooling water into the cooling line.
(2) Turn on the POWER switch and check if the POWER lamp (Fig. 2-2 (5)) lights. And the
rotor of the turbo molecular pump is levitated by the magnetic bearing.
Maintained push the RESET button to change from REMOTE mode to LOCAL mode.
The POWER lamp blinks when becoming a LOCAL mode.
(3) Evacuate the turbo molecular pump by using a backing vacuum pump.
(4) Start-up preparation is complete if the pressure in the turbo molecular pump reduces below
200 Pa.
6.2.2 S
tart-up Preparation Sequence in REMOTE-control Connector
(1) Feed the cooling water into the cooling line.
(2) Turn on the POWER switch and check that the POWER lamp are illuminated and, in
addition, the "REMOTE" signal (Refer to Table 6-4) of the remote-control connector is ON
in this product of a standard spec. Under this condition, the rotor of the turbo molecular
pump is levitated by the magnetic bearing.
(3) Evacuate the turbo molecular pump by using a backing vacuum pump.
(4) Start-up preparation is complete if the pressure in the turbo molecular pump reduces below
200 Pa.
Summary of Contents for UTM3400 Series
Page 2: ...This page is intentionally left blank...
Page 10: ...viii Location of Label...
Page 20: ...6 1 1 2 Descriptions This page is intentionally left blank...
Page 21: ...2 2IDENTIFICATION AND FUNCTION 2 1 Pump Main Unit 2 2 Control Panel 2 3 External I F Panel...
Page 30: ...16 3 3 3 Controller This page is intentionally left blank...
Page 36: ...22 4 4 3 Standards Fulfilled This page is intentionally left blank...
Page 50: ...36 5 5 5 Notes on Transportation This page is intentionally left blank...
Page 72: ...58 6 6 8 Communication Specifications This page is intentionally left blank...
Page 73: ...7 7GAS PURGE...
Page 82: ...68 8 8 6 Turbo Molecular Pump Return Request This page is intentionally left blank...
Page 95: ...10 10WARRANTY CLAUSES...
Page 98: ...84 10 This page is intentionally left blank...
Page 100: ...Index Index 2 This page is intentionally left blank...