2
Installation
Installation Checklist
10
Accela Pump Hardware Manual
Thermo Scientific
Installation Checklist
For the proper installation of your Accela Pump, complete these steps and keep this checklist
in your maintenance records.
U
Unpack and inspect your instrument (see
“Unpacking and Inspecting the Instrument”
on
page 11
).
U
Read the safety precautions.
U
Position the pump appropriately (see
“Making the Initial Instrument Preparations”
on
page 12
).
U
Make the back panel connections (see
“Making the Initial Back Panel Connections”
on
page 13
).
U
Connect the solvent lines (see
“Connecting the Low-Pressure Solvent Lines”
on
page 17
).
U
Connect the power cord and turn on the instrument (see
“Powering On for the First
Time”
on
page 24
).
U
Add the pump to the instrument configuration (see
Chapter 3
,
“Data System
Instrument Configuration”
on
page 25
).
U
Prime the pulse dampener (see
“Priming the Pulse Dampener”
on
page 41
).
This Accela Pump was installed by:
(Name)
(Date)