Thermo Scientific
Accela Pump Hardware Manual
9
2
Installation
This chapter provides instructions for the initial installation of your Accela Pump, including
connections to other modules in the system. Use the Installation Checklist on the back of this
page as a quick reference. Make a copy of the checklist and fill it out when you have
successfully completed the installation. Include the completed checklist in your maintenance
records.
Perform the installation in the sequence presented on the Installation Checklist and detailed
in this chapter.
Contents
•
Installation Checklist
•
Unpacking and Inspecting the Instrument
•
Making the Initial Instrument Preparations
•
Making the Initial Back Panel Connections
•
Connecting the Low-Pressure Solvent Lines
•
Connecting the Pump to the Autosampler
•
Powering On for the First Time