29
C H A P T E R
3
Installing the StorEdge S1 Enclosure
This chapter provides instructions on preparing the area, connecting the cables, and
powering on the storage enclosure.
This chapter is organized as follows:
■
“Mounting the StorEdge S1 Enclosure in a Rack” on page 30
■
“Setting the SCSI IDs” on page 39
■
“Connecting the Cables” on page 47
■
“Powering On the Storage Enclosure” on page 54
Summary of Contents for StorEdge S1 AC100
Page 8: ...viii StorEdge S1 AC100 and DC100 Installation and Maintenance Manual March 2002...
Page 22: ...xxii StorEdge S1 AC100 and DC100 Installation and Maintenance Manual March 2002...
Page 30: ...xxx StorEdge S1 AC100 and DC100 Installation and Maintenance Manual March 2002...
Page 32: ...xxxii StorEdge S1 AC100 and DC100 Installation and Maintenance Manual March 2002...
Page 52: ...16 StorEdge S1 AC100 and DC100 Installation and Maintenance Manual March 2002...
Page 64: ...28 StorEdge S1 AC100 and DC100 Installation and Maintenance Manual March 2002...
Page 92: ...56 StorEdge S1 AC100 and DC100 Installation and Maintenance Manual March 2002...
Page 116: ...80 StorEdge S1 AC100 and DC100 Installation and Maintenance Manual March 2002...
Page 128: ...Index 92 StorEdge S1 AC100 and DC100 Installation and Maintenance Manual March 2002...