EUD-2016026-00 Rev.2, SmartScanIS User’s Guide for Union Pacific, 14 January 2021
87
5.5 Preparing the Pull Box and PVC Pipes
To ready the pull box and PVC pipes:
1
Using the figure below and following your company's standards, dig trenches for the
pull box and the PVC pipes.
2
Install the pull box.
3
Lay four 2-inch PVC pipes from the pull box to the bungalow.
Later, these four pipes will contain cables from the scanners and transducers to the
bungalow.
4
Lay two 1-1/2-inch PVC pipes from the mast bases to the bungalow.
Later, these two pipes will contain cables from the AEI antennas to the bungalow.
5.6 Receiving Your System
All the dragging-equipment detectors that a site needs are shipped on one pallet. All the
components that make up one or more systems are shipped either in a crate or in a bungalow,
if one was ordered. The contents of this crate or bungalow are specific to the site and are
detailed on the packing list.
When the packages arrive at the site, check them immediately for exterior damage. If there is
any, notify STC.
Summary of Contents for SmartScanIS
Page 1: ...EUD 2016026 00 Rev 2 SmartScanIS User s Guide for Union Pacific 14 January 2021...
Page 82: ...82 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Page 90: ...90 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Page 130: ...130 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Page 258: ...258 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Page 376: ...376 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Page 380: ...380 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...