8-45
HDW-750/750CE V1
5. CUE/TC head azimuth adjustment
(Refer to Section 8-2-6.)
6. CUE/TC head tape-to-head contact
check
(Refer to Section 8-2-7.)
7. CUE/TC head height check
(Refer to Section 8-2-5.)
8. CUE/TC head position recheck
Check it following the steps 1 and 2.
8-2. Tape Run System Adjustment