7-43
HDW-750/750CE V1
Installation
2. Cleaning the mount shaft
Clean the pinch roller assembly mount shaft using a cleaning cloth moistened with
cleaning fluid.
3. Installing the pinch roller assembly
Install the pinch roller assembly to the pinch roller assembly mount shaft. Tighten
the precision screw that is removed in step 1.
The standard tightening torque value : 10
x
10
_
2
N
.
m (1 kgf
.
cm)
n
Never touch the pinch roller assembly surface with bare hands.
n
Top and bottom of the pinch roller assembly are identical and cannot be identified
each other.
4. Cleaning the pinch roller assembly
Clean the surface of the pinch roller assembly using a cleaning cloth moistened with
cleaning fluid.
Rotate the manual eject gear (A) clockwise until the unit returns to the unthreading-
end state.
Adjustments after Replacement
5. Tape run adjustment
(Refer to Section 8-2-1.)
6. CUE/TC head height check
(Refer to Section 8-2-5.)
7-7. Pinch Roller Assembly Replacement