1-19
FVS-1000 MMP1
BP screw
BP screw
Vinyl tape
1-10. Installation Procedure
6. Removing the screws fixed during the transportation (Serial Nos. 10002, 10003,
10005, 10101, 10201, 10401 through 10403)
This procedure is not required for the FVS-1000 other than above serial Nos.
Remove the vinyl tape and two BP screws fixed during the transportation.
n
Store the removed BP screws for transportation in the drawer of the unit.
7. Prevention of falling down
To prevent the FVS-1000 from falling down by an earthquake etc., it is recommended to fix the FVS-1000.
w
To prevent the FVS-1000 from falling down or moving, be sure to fix the FVS-1000 to the ceiling which
has the enough strength using a chain etc.
Fixing to the ceiling or pillar (using eyebolt)
On the top of the FVS-1000, there are four eyebolts (M12). Connect the eyebolts and the pillar or ceiling
which has enough strength by a chain etc. with the chain slacked.
Eyebolts
Eyebolts