1-43
FVS-1000 MMP1
Installation Flow Chart
According to the following flow chart, install the BKFV-500.
Start
2. Removal of the S-AU assembly
Completion
3. Installation of the AU-278 board
1. Removal of the FTP panel
4. Connection of the inter lock harness
7. Adjustment
5. Installation of the analog audio assembly
6. Guide roller height adjustment
10. Installation of the caution label
8. Installation of the FTP panel and
S electrode of ionizer
9. Installation of the audio cover and handle
1-11. Installation of Optional Units