
-1-
No. JXC
※
-OMT0002-C
Contents
1. Safety Instructions ............................................... 5
2. Product Outline .................................................... 7
2.1 Features ..................................................................................... 7
2.2 How to Order.............................................................................. 8
2.3 Product configuration ............................................................... 9
3. Procedures to Trial run ...................................... 10
3.1 Checking the contents of the package ................................. 10
3.2 Mounting the controller .......................................................... 11
3.3 Install the setting software and the driver ........................... 11
3.4 Wiring and connection ........................................................... 11
3.5 Power supply, Start-up of controller setting software, and Alarm check 11
(1) Supplying power ............................................................... 11
(2) Start-up of controller setting software ........................... 12
(3) Alarm check ...................................................................... 13
3.6 Parameters and Step data ...................................................... 14
(1) Select the actuator ........................................................... 14
(2) Setting parameters ........................................................... 17
(3) Step data settings............................................................. 19
3.7 Check using JOG operation ................................................... 20
(1) Change to Remote mode ................................................. 20
(2) Return to origin ................................................................. 21
(3) JOG or Inching .................................................................. 22
3.8 Operation test using Test Drive ............................................. 23
(1) Test Drive setting .............................................................. 23
(2) Change to Remote mode ................................................. 23
(3) Return to origin ................................................................. 24
(4) Test drive starts ................................................................ 24
3.9 EtherNet/IP communication setting and checking .............. 25
(1) Controller setting .............................................................. 25
(2) PLC set up ......................................................................... 25
(3) LED Display ....................................................................... 25
3.10 Operation test by PLC .......................................................... 25
4. Product Specifications ...................................... 26
4.1 Basic Specifications ............................................................... 26
4.3 Parts Description .................................................................... 28
4.4 Dimensions .............................................................................. 30
(1) Direct mounting ................................................................ 30
(2) DIN rail mounting .............................................................. 30
4.5 Mounting .................................................................................. 31
(1) Mounting............................................................................ 31
(2) Grounding ......................................................................... 32
(3) Mounting location............................................................. 33
5. Initial Setting Method ......................................... 34
5.1 Controller setting (IP address setting) ................................. 34