46/88
Siemens Synco
900
CE1C2707en
Building Technologies
Commissioning the system
05.07.2007
Connect meteo sensor
Inform the central apartment unit that you want to assign a meteo
sensor:
Main menu > Commissioning > RF connections > Meteo sensor >
Connect device:
The QAC910 meteo sensor is automatically switched on as soon as
the batteries are inserted.
When switching on (power-up), the batteries’ capacity is tested.
If the capacity is sufficient, the green LED is lit for 2 seconds during
the test.
If the batteries’ capacity is not sufficient for operation, the LED
is lit red for 2 seconds – provided capacity is still sufficient.
After the battery test, the device changes directly to normal operation.
The LED extinguishes again.
F
LED
2
707
Z
18
Now, press multifunction button F on
the meteo sensor. The LED lights up
in accordance with the batteries’
capacity (green: Bat. ok, red: Bat. not
ok). When the LED starts blinking,
you can release the binding button.
F
= multifunction button
LED = light emitting diode
Now, the connection LED on the device blinks green and extin-
guishes on successful completion of the binding process with the
central apartment unit.
To confirm the successful connection, the central apartment unit
delivers a beep. Close the binding process by pressing the
Menu/ok
button.
The device is now connected and performs normal operation.
Connect light and blind actuators
GAMMA wave light and blind actuators can only be assigned
to switching groups which, beforehand, were set up for the
respective function. Refer to ”Activating switching groups“ on
page 21.
The light and blind actuators are switched on as soon as power is
applied to them.
When commissioning GAMMA wave light actuators, a lamp
must be connected. Otherwise, the actuators are not correctly
powered, which means that they cannot be connected.
On the central apartment unit, select the switching group which you
want to assign actuators:
Summary of Contents for Synco 900
Page 1: ...Synco 900 Mounting and commissioning Edition 2 0 Controller series B CE1C2707en 05 07 2007 ...
Page 2: ......
Page 84: ...84 88 Siemens Synco 900 CE1C2707en Building Technologies 05 07 2007 ...
Page 85: ...85 88 Siemens Synco 900 CE1C2707en Building Technologies 05 07 2007 ...
Page 86: ...86 88 Siemens Synco 900 CE1C2707en Building Technologies 05 07 2007 ...
Page 87: ......