
Replacing boards / replacing components
6 - 37
Siemens AG
SPR2-230.061.01
Page 37 of 48
SIREMOBIL Iso-C
Medical Solutions
Rev. 13
12.04
CS PS 24
System Manual
Cutt-off delay - PC board D210
•
In the monitor trolley, PC board D210 is installed above the mains filter (Fig. 11) .
•
Disconnect the system from the power supply by pulling the mains plug out of the mains
socket.
•
Loosen the 4 fastening nuts of PC board D210.
•
Unplug all connectors.
•
Replace board D210 and fasten the new PC board with the 4 nuts.
•
Reconnect all connectors.
•
Connect the monitor trolley to the power supply again.
•
Switch the monitor trolley on and wait for the run-up.
•
Check the cut-off delay.
•
After the power OFF button has been pressed, the monitor trolley must switch off after
approx. 3 minutes.
Fig. 11
Electrical voltage!
See Chapter 1, Safety Information.
Switch system power supply off and disconnect the power plug.
Only applies to SIREMOBIL Iso-C 3D.
WARNING
NOTE